Supply & Delivery of Two (2 off) New Under Pressure Drills (UPD) for Water Connections.

1. Supply and delivery of (2 off) new purposed manufactured Under Pressure Drills (UPD) for water   connections.

2. The Under Pressure Drills are required to perform under pressure drilling which is the precise process of drilling a hole into a pressurised/flowing water pipe system without leaking its contents or interrupting flow.

UPGRADE OF RESTRICTIONS ON THE USE OF WATER

BITOU LOCAL MUNICIPALITY

The Level one (Moderate) drought restrictions currently implemented will be upgraded to Level Two with effect from 3 April 2023, in line with Bitou Municipality’s Drought Management Policy to manage and prevent the increased risk in the possibility of water shortages. This intervention is triggered mainly due to the level of the Roodefontein dam dropping to below 66% and below average rainfall experienced and expected in the region.